Conestoga Creek Interceptor - Lancaster, PA


PROJECT details

Client: Lancaster Area Sewer Authority

Location: Lancaster, PA

Capabilities: Rehabilitation

Services: Bypass Pumping, CIPP, CCTV & Cleaning

Contract Value: $3,755,050.35

  • Spiniello successfully rehabilitated more than 5,000-feet of 42-inch sewer pipe with cured-in-place pipe (CIPP) lining, and completed structural restoration of 10 manholes with geopolymer lining. To facilitate this work, Spiniello engineered and installed a temporary bypass pumping system capable of handling peak flows of up to 25-million gallons per day (MGD). This system remained operational 24/7 to ensure uninterrupted service.

     

    Because the project was located primarily within a local community park, Spiniello deployed temporary composite ground matting to provide safe equipment access while also protecting the natural environment. Special attention was given to the surrounding community in order to minimize disruptions.

 
 

Previous
Previous

Joint Outfall “B” Unit 1A Trunk Sewer Rehabilitation Phase 1

Next
Next

Four Mile Creek Trunk Sewer Rehabiliation