0
Skip to Content
Spiniello | Pipeline Rehabilitation & Construction
About
About Us
Management Team
Our History
Capabilities
Excavation for Water & Wastewater
Bypass Pumping Solutions
CCTV & Cleaning – Water & Wastewater
Lead Service Line Replacement (LSLR)
CIPP Lining
Geopolymer Lining
Sliplining
Pipe Bursting
Shotcrete
Cement Mortar Lining
Safety
Projects
Careers
Contact
Spiniello | Pipeline Rehabilitation & Construction
About
About Us
Management Team
Our History
Capabilities
Excavation for Water & Wastewater
Bypass Pumping Solutions
CCTV & Cleaning – Water & Wastewater
Lead Service Line Replacement (LSLR)
CIPP Lining
Geopolymer Lining
Sliplining
Pipe Bursting
Shotcrete
Cement Mortar Lining
Safety
Projects
Careers
Contact
Folder: About
Back
About Us
Management Team
Our History
Folder: Capabilities
Back
Excavation for Water & Wastewater
Bypass Pumping Solutions
CCTV & Cleaning – Water & Wastewater
Lead Service Line Replacement (LSLR)
CIPP Lining
Geopolymer Lining
Sliplining
Pipe Bursting
Shotcrete
Cement Mortar Lining
Safety
Projects
Careers
Contact

 

Baltimore Sanitary Contract - 875 (Copy)

Baltimore Sanitary Contract - 875

Involved sewer rehabilitation for a total of almost 4,700 linear feet in a 78” reinforced concrete pipe. 2,550 of which called for CIPP, while the remaining 2,140 feet utilized a carbon fiber reinforced polymer. Inflow and infiltration were minimized, all the while, Sunbelt Rentals helped employ a 150 MGD bypass that kept sewer flow consistent. This project specifically called for extensive continuous bypass monitoring.

Pine Tree SAG (Copy)

Pine Tree SAG

Pine Tree Sag Pipe Cement-Mortar Lining, clean and cement-mortar line, in place, by the centrifugal process, the interior surfaces of
approximately 3,841 linear feet of 108-inch riveted steel pipe.

Cedar Rapids (Copy)

Cedar Rapids

Main Interceptor Rehabilitation - Rehabilitation of 4,411 LF of 96-inch diameter RCP sanitary sewer 24' deep & 48" flow by slip-lining 84" FRP in the wet, 490 LF of 96" with CIPP liner, 60 MGD bypass pumping, new manholes and abandoning nine existing manholes. 

North Outfall Sewer Maze Rehab Phase V (Copy)

North Outfall Sewer Maze Rehab Phase V

This project principally consisted of rehabilitation by lining of approximately 8,000 feet of large diameter sewers (60” to 75”), rehabilitation of large junction Structures, construction of two Transition Structures at transitions between 60 inch SEP and 42 inch circular VCP and construction of approximately 3,000 feet of 8” sewers.

Newman Springs Pump Station Twin 24" Dishcharge Main Rehab (Copy)

Newman Springs Pump Station Twin 24" Dishcharge Main Rehab

The project required the CIPP lining of twin - 24” water lines with a class 4 structural liner designed for an operating pressure of 120psi and a test pressure of 150psi. Each line was approximately 700’ long, having several elbows and offset joints.

Mentone Pipeline (Copy)

Mentone Pipeline

Mentone Pipeline South and East Foothill Pipeline C51449 - Cranford Hill Pumping Station East Branch Extension PH II - Installation of 29, 875 LF of 66" and 72" steel pipeline and steel fitting, clearing, dewatering, trench excavation, testing and surface restoration

Pennsylvania American Water (Copy)

Pennsylvania American Water

Coatesville West End Water - 50,000 LF of water main sliplining -- 12" & 16" FPVC within 24" cast iron.

Route 3 Passaic River Crossing (Copy)

Route 3 Passaic River Crossing

Route 3 Passaic River Crossing Sewer Rehabilitation DP08164 -Installation of 920 LF of 99" x 99" Non-circular Fiberglass Liner Pipe
in 108-inch Arch-Shaped Concrete Sanitary Sewer, (2) Access Pits, 20' of 6" DIP, 1 FH, Traffic Control and Surface Restoration.

Ashland Plant Sewer Rehabilitation (Copy)

Ashland Plant Sewer Rehabilitation

Chemical Sewer CIPP Lining (Ashland Plant). Rehabilitation of 1,318LF of 18", 4,912 LF of 21" diameter sewer by cured-in-place pipe lining.

Mojave Siphon Power Plant (Copy)

Mojave Siphon Power Plant

Pennstock Bypass Connection, Mojave Siphon Power Plant Installation of 60 LF of 120-inch diameter steel pipe, fabricated with
80 degree bend, to be placed for connection from existing tee on Barrel No 3 to existing PCCP, demolition, earthwork, reinforced concrete structure, mechanical and electrical work.

Four Mile Creek Trunk Sewer Rehabiliation (Copy)

Four Mile Creek Trunk Sewer Rehabiliation

Four Mile Creek Trunk Sewer Rehabilitation - Rehabilitation of existing 84" diameter trunk by sliplining with 4, 022 LF of 72" FRP pipe in the wet 20FT deep & 48" high flow, rehabilitation of existing 27" diameter by sliplining 325 LF of FRP pipe, two reinforced concrete juction chambers and manholes, sewer crown treatment of 28,780 LF fo existing 60", 72" and 84" sewers.

Conestoga Creek Interceptor - Lancaster, PA (Copy)

Conestoga Creek Interceptor - Lancaster, PA

Rehabilitation of close to 3,000 linear feet of 42” sewer via Geopolymer, reducing inflow and infiltration. 24” bypass is pictured.

Contact us for More Information

Contact Us

⸻
NAVIGATION

PROJECTS

CAREERS

CONTACT

ABOUT US

CAPABILITIES

SAFETY

⸻
locations

  • 354 Eisenhower Pkwy.
    Plaza 2, Suite 1850
    Livingston, NJ 07039

    P: (973) 808-8383
    F: (973) 808-9591

  • 3500 East Biddle St.
    Baltimore, MD 21213

    P: (410) 235-0094
    F: (410) 243-6529

  • 6301 Ivy Ln., Suite 620
    Greenbelt, MD 20770

    P: (201) 787-0923

  • 2650 Pomona Blvd.
    Pomona, CA 91768

    P: (909) 610-9876
    F: (909) 610-9874


© 2024 Spiniello Companies. All Rights Reserved. Privacy Policy.