Newman Springs Pump Station Twin 24" Discharge Main Rehab


The project required the CIPP lining of twin - 24” water lines with a class 4 structural liner designed for an operating pressure of 120psi and a test pressure of 150psi. Each line was approximately 700’ long, having several elbows and offset joints.

SCROLL DOWN

Newman Springs Pump Station Twin 24" Discharge Main Rehab


The project required the CIPP lining of twin - 24” water lines with a class 4 structural liner designed for an operating pressure of 120psi and a test pressure of 150psi. Each line was approximately 700’ long, having several elbows and offset joints.

The twin lines went under a river and marshland. The project required four pits, with the deepest pit on the eastern side, built directly adjacent to a four lane, heavily traveled road, a bridge and the river. The project required the replacement of two 24' valves and 2-6" Blow offs. Each inversion and cure was completed in a 12 hour period. The liner was supplied by Nordipipe. Spiniello completed the work in a timely manner, to the satisfaction of the owners and engineers.

Services