Challenges:

  • Deep digs
  • Pipe had a depth of 20 feet
  • Soil was running stand with heavy ground work
  • The flow had to be bypassed with (2) 6” pumps
  • Heavy cleaning had to be done due to the collapsed pipe

This project was completed successfully within 3 weeks.